Piping Completed

Fire Protection System, Dahej

Installation of 150 MT fire water pipeline network, hydrant and sprinkler systems for Tata Projects Limited at Dahej, Gujarat.

150 MT
Total Piping
8 Months
Duration
Dahej
Location
2023
Year
Location
Dahej, Gujarat
Total Tonnage
150 Metric Tonnes
Duration
Apr 2023 – Nov 2023
Client
Tata Projects Limited
Project Overview

About This Project

GM Engineering & Project was awarded the fire protection system package for Tata Projects Limited at their industrial facility in Dahej, Gujarat. The scope covered complete installation of 150 MT of fire water pipeline network, hydrant and sprinkler systems, fire pumps, pipe supports, and full system commissioning support.

The project was executed within an operational industrial area at Dahej "” one of Gujarat's largest petrochemical and industrial zones "” requiring strict adherence to fire safety norms, permit-to-work procedures, and third-party inspection requirements at every stage.

All work was completed within the contracted timeline from April to November 2023, with full regulatory compliance, zero major safety incidents, and successful hydro testing and commissioning handover to Tata Projects.

Scope of Work

What We Delivered

Fire Water Pipeline Network
Complete installation of underground and above-ground fire water pipeline network across the facility
Hydrant & Sprinkler Systems
Erection of fire hydrant posts and sprinkler systems as per fire safety layout drawings
Fire Pump Installation
Installation of diesel, electric, and jockey fire pumps with associated pipework and fittings
Pipe Supports Fabrication & Installation
Fabrication and installation of all pipe support structures, clamps, and hangers
Hydro Testing & Commissioning
Full hydrostatic testing of all pipelines and commissioning support through to system handover
Client & Inspection Coordination
Coordination with Tata Projects and third-party inspection agencies throughout execution
Engineering Challenges

Challenges & Solutions

Installation in an Operational Industrial Area with Strict Fire Safety & Inspection Requirements

Executing fire protection system installation within an active industrial zone at Dahej required uninterrupted operations, strict compliance with fire safety norms, and passing rigorous inspection requirements at every stage.

Solution
  • Executed work in phases to avoid disruption to ongoing plant operations
  • Followed strict fire safety protocols and permit-to-work procedures at all times
  • Ensured quality checks and pressure testing at every stage of installation
  • Maintained close coordination with Tata Projects and inspection agencies throughout
Key Outcomes

Project Results

Successfully completed within project timeline
Fully compliant with fire safety regulations
Zero major safety incidents during execution
Smooth testing and commissioning support provided
High reliability and strong client satisfaction from Tata Projects

Project Specifications

  • Location
    Dahej, Gujarat, India
  • Client
    Tata Projects Limited
  • Category
    Piping & Fire Protection
  • Total Tonnage
    150 Metric Tonnes
  • Duration
    April 2023 – November 2023
  • Safety Record
    Zero Major Incidents
  • Status
    Completed